Home
About Gil
Consulting
Training and Development
Products
Lean Business
Case Studies
Testimonials
Clients
Management
Biographies
Articles
Recommended
Reading
Links
Past Tips
Español
Português
E-newsletter
Contact
Speakers

 

Memberships & Affiliations


Medical Device Manufacturer-NV
Improve Operational Efficiency in the Electronic Filter Assembly


The Challenge:

  • Improve plant productivity and profitability
  • Multilingual workforce
  • Medical and industrial businesses at the same site.

The Approach:

  • Implement Flow
  • Design and implement assembly cells


The Solution:

  • Trained the entire workforce in Lean Manufacturing.
  • Conducted eight Kaizen Events; from implementing assembly cells to implementing new facility layouts to improve product flow.
  • Set new metrics in place
  • Instituted shift start-up meetings and visual controls


The Results:

  • Reduced time to ship by 45%.
  • Designed and installed five assembly cells improving productivity by 39%
  • Eliminated all Saturday Overtime, which had been in place for the previous two years.
  • Reduced defectives by 15%.


back to main Case Studies

 

 


Products | Lean Business | Case Studies | Testimonials

© 2001 - 2006 Global Innovation Leadership, Inc.

PO Box 770430
Miami, Florida 33177

E-mail: Info@global-innovation.com
Phone: (305) 256-0961 • Toll free: 1-866-565-3631 • Fax: (305) 378-8459

graphic design by Henson Designs         webdesign by PlanetLink